QUAINT (Quantitative Analysis of Italian National Transport)

QUAINT (Quantitative Analysis of Italian National Transport)

  The research programme QUAINT A comprehensive tool for the quantitative analysis of Italian national transport plans and policies, is funded by the Italian Ministry…

Read Article →
2015. Porti Leggeri

2015. Porti Leggeri

The objective of Signa Maris is the promotion and valorization of tourism in Italy, via the sea – specifically, it is the enhancement of access…

Read Article →
2015. COST Action TU1408 “Air Transport and Regional Development” (ATARD)

2015. COST Action TU1408 “Air Transport and Regional Development” (ATARD)

COST is the longest-running European framework supporting trans-national cooperation among researchers, engineers and scholars across Europe. TRASPOL is part of the COST program through the…

Read Article →
2015. Course "Relation between territorial and mobility Systems"

2015. Course “Relation between territorial and mobility Systems”

TRASPOL has contributed to the training course “Relazione tra Sistema Territoriale e Sistema della Mobilità “, coordinated by prof. Paola Pucci and designed for technical…

Read Article →
2015. Long distance coach services: the effects of the reform. Results, opportunities and critical aspects following the opening of the market.

2015. Long distance coach services: the effects of the reform. Results, opportunities and critical aspects following the opening of the market.

The research updates the 2011 and 2013 studies on the long-distance bus transport in Italy. After nearly one year since the liberalization, the study aims…

Read Article →
2015. Study on upgrade alternatives for the Milano-Mantova railway line

2015. Study on upgrade alternatives for the Milano-Mantova railway line

The study analyses the main problems of the Codogno – Mantova railway. The starting point is the analysis of the document Protocollo di Intesa signed…

Read Article →
2015. A19 Palermo-Catania motorway interruption: a preliminary evaluation of the impacts

2015. A19 Palermo-Catania motorway interruption: a preliminary evaluation of the impacts

A preliminary estimation, calculated thanks to a transport model and in collaboration with Studio Meta, identifies in over 18 million Euro per year the economic…

Read Article →