![2012. Consultancy on the report “Misure per ridurre il tempo verso la crescita”](https://www.traspol.polimi.it/wp-content/uploads/2015/05/INFRASTRUCTURE-470x140.png)
TRASPOL has worked together with motorway, rail and construction operators, to realize the document Misure per ridurre il tempo verso la crescita. The document focuses…
![2012. Study on the feasibility of the new Caserta Grazzanise airport](https://www.traspol.polimi.it/wp-content/uploads/2015/05/air-470x140.jpg)
The study analysed the proposed new Caserta-Grazzanise airport, near Naples, and suggested possible technical and quantitative hints to discuss about its socio-economic feasibility. We analysed…
![2012. Cost-Benefit Analysis of M4 metro line in Milan](https://www.traspol.polimi.it/wp-content/uploads/2015/05/2014-03-24-M4-470x140.png)
The M4 metro line will connect the airport of Milano Linate and the eastern part of the city, with S. Cristoforo rail station and the…